This page contains NRT ADT from the SWOT KaRIn altimeter. This product is a 120km wide swath of data (2 wings of 55km each, with a 10km gap at the nadir), and these widths are respected in these plots.
Note that the plots shown here are listed in reverse chronological order. Be aware that it can take as long as 5 days between the data time and the time the plot appears here, because of the large data volume and computational resources required by PO.DAAC to process and distribute the data.
Back to the NESMA Sea Exercise page