Fixed 1Sv N Initial Transport Between Taiwan and Mainland China
Forecast for 6 September 2008, Issued 4 September 2008
Fixed 1Sv N Initial Transport Between Taiwan and Mainland China
Below are every 2-day snapshots from a 10 day unforced simulation, initialized
with summer climatology. During the initialization procedure, a fixed
1 Sv northward initial transport was imposed between Taiwan and Mainland China.
Snapshots from the simulation with a free 2.5 Sv southward transport can be found
here.
Acoustic simulations from each of these two dynamical simulations, with vertical sections
of transmission loss (TL) and sound speed, can be found
here.